Contractor's Guide to the FIDIC Conditions of Contract
This guide will help the contractor’s staff overcome some of the difficulties encountered on a typical international contract using FIDIC forms.
The majority of FIDIC-based contracts use the Red Book (Conditions of Contract for Construction), so this book concentrates on the use of those particular forms. Supplementary comments are included in Appendix C for the Yellow Book (Plant & Design-Build) recommended for use where the contractor has a design responsibility.
The Contractor is represented on site by the Contractor’s Representative who carries the overall responsibility for all the Contractor’s on-site activities. In order to provide guidance to the Contractor’s Representative and his staff, this book is divided into five sections:
-
A summarized general review of the Red Book from the Contractor’s perspective.
-
A review of the activities and duties of the Contractor’s Representative in the same clause sequencing as they appear in the Red Book.
-
A summary of these activities and duties but arranged in order of their likely time sequence on site. This has the added intention of providing the Contractor’s Representative with a means of ensuring that documents are not only properly provided to the Employer and Engineer, but most importantly that they are provided within the time limits specified in the Contract.
-
A selection of model letters is provided which make reference to the various clauses of the contract requiring the Contractor to make submissions to the Employer or Engineer.
-
Various appendices.
Publisher: | Wiley-Blackwell |
ISBN: | 9780470657645 |
Author(s) | Robinson, MD |
Edition | |
Format | Hb |
Publication Date | 30/04/2011 |